Means and Values of Nodes

Context

  • At the top of each Monitor, the items Mean, Dev, and Value are displayed.

  • Mean refers to the Mean Value m and is only shown in the Monitors of numerical nodes.

  • Dev stands for Standard Deviation and is shown alongside Mean.

  • Value refers to the Expected Value vv and is shown in all Monitors, regardless of the node type, i.e., categorical or numerical.

Examples

  • The calculations for Expected Value and Mean Value are shown in the context of the following examples:

Categorical Node

Let's take the discrete node Age with three categorical Node States:

  • Child

  • Adult

  • Senior

Categorial Node with Assigned State Values

  • In the Node Editor, you can assign State Values to the Node States of Age.

For each node, the Expected Value vv is computed using the assigned State Values and the marginal probability distribution of the Node States:

v=sSps×Vsv = \sum_{s \in S} p_s \times V_s

where pp is the marginal probability of state ss and VsV_s is its associated value.

v=0.23×10+0.415×40+0.355×70=43.750v = 0.23 \times 10 + 0.415 \times 40 + 0.355 \times 70 = 43.750

The Monitor shows vv as the Value of Age.

A Monitor of a categorical node does not show a Mean value.

Discrete Numerical Variable

Let's suppose that the node Age has three numerical Node States instead of categorical Node States.

In this context, we need to consider two conditions, with and without State Values specified in the Node Editor:

No State Values Specified

Here, State Values are not specified in the Values tab of the Node Editor. Note the empty Value column below.

As a result, BayesiaLab uses the numerical values of the Node States, as they appear in the States tab, as the State Values.

Furthermore, as Age is a numerical node, its Monitor will now display the Mean (Mean) and the Standard Deviation (Dev) in addition to the Expected Value (Value)

The Mean m is computed using the numerical values of the Node States and the marginal probability distribution of the Node States:

m=sSps×csm = \sum_{s \in S} p_s \times c_s

where csc_s is the numerical value of the Node State.

m=0.23×10+0.415×40+0.355×70=43.750m = 0.23 \times 10 + 0.415 \times 40 + 0.355 \times 70 = 43.750

Note that Mean and Value are identical in this case.

State Values Specified

However, if State Values are separately specified in the Values tab of the Node Editor, they will be used for the calculation of Value in the Monitor.

To highlight the distinction between the Node States {10, 40, 70} and the State Values, we assign unrelated arbitrary State Values of 0, 1, and 2.

The Expected Value vv is computed now using the assigned State Values {0, 1, 2} and the marginal probability distribution of the Node States:

v=sSps×Vsv = \sum_{s \in S} p_s \times V_s

where pp is the marginal probability of state ss and VsV_s is its associated value.

v=0.23×0+0.415×1+0.355×2=1.125v = 0.23 \times 0 + 0.415 \times 1 + 0.355 \times 2 = 1.125

The Monitor shows vv as the Value of Age.

Note that Mean and Value are not identical in this case.

Continuous Numerical Variable

Let's now consider a continuous variable Age defined in the domain [0; 99], discretized into three states:

  • Child: [0 ; 18]

  • Adult: ]18 ; 65]

  • Senior: ]65 ; 99]

Given Age is a numerical node, its Monitor shows the Mean (Mean), the Standard Deviation (Dev), plus the Expected Value (Value).

No Associated Data

If no associated data is with the node, both csc_s and VsV_s are defined as the mid-points of the minimum and maximum values of each Node State. For example, for the Node State Adult ]18; 65], the midpoint is 17.2225.

So, the Mean Value m is computed as follows:

m=sSps×csm = \sum_{s \in S} p_s \times c_s

m=0.23×9+0.415×41.5+0.355×82=48.4025m = 0.23 \times 9 + 0.415 \times 41.5 + 0.355 \times 82 = 48.4025

The Expected Value vv is calculated analogously:

v=sSps×Vsv = \sum_{s \in S} p_s \times V_s

v=0.23×9+0.415×41.5+0.355×82=48.4025v = 0.23 \times 9 + 0.415 \times 41.5 + 0.355 \times 82 = 48.4025

Associated Data

If data is associated with the node, csc_s is defined as the arithmetic mean of the data points that are associated with each Node State.

Furthermore, clicking on the Generate Values button in the Node Editor sets the values VsVs to the current arithmetic means of each Node State.

Value Delta

If you set a new piece of evidence on a node that modifies the distribution of the node, the Monitor displays a delta value in parentheses adjacent to Value.

This delta is the difference between the current Expected Valuev and:

  • the Expected Value vv before setting the modifying evidence, or

  • the Expected Value vv that corresponds to the Reference Probability Distribution, which you can set with the icon in the toolbar.

Special Case: Some Node States Without Values

If only some Node States have an associated value, the Expected Value vv is computed from the subset of Node States S{S^*} that do have an associated value.

v=sSpsP×Vsv = \sum_{s \in S^*} \frac{p_s}{P^*} \times V_s

If a node only has a single Node State with an associated value, the corresponding Monitor does not report the Expected Value vv.

Last updated

Logo

Bayesia USA

info@bayesia.us

Bayesia S.A.S.

info@bayesia.com

Bayesia Singapore

info@bayesia.com.sg

Copyright © 2024 Bayesia S.A.S., Bayesia USA, LLC, and Bayesia Singapore Pte. Ltd. All Rights Reserved.